Horizontal Directional Drilling (HDD) - Underground Cable, SKTT 150 KV, Procurement and Construction Services Project, Pecatu - Nusa Dua.

PT. SURYA CIPTA TEKNIK (Joint Operation with Ida Iasha Nusantara)

  • Position : Sub Conctractor
  • Duration : September 2018 to February 2019
  • Location : Bali-Indonesia
  • Scope of Work  :  Construction Project (HDD - 2 Hole x 5.000 mtr ; 3 x 8" & 3 x 8"+ 1 x 4")
  • Contract Value  :  Rp. 17.500.000.000 
  • Main Contractor :  PT. Kabel Metal Indonesia - PT. Centra Multi Elektrindo
  • Owner  :  PT. Perusahaan Listrik Negara